Completely Stirred Tank Reactor Costing Method
Costing Method Parameters
The following parameters are constructed for the unit on the FlowsheetCostingBlock (e.g., m.fs.costing.cstr) when applying the cost_cstr costing method in the watertap_costing_package
:
Description |
Symbol |
Parameter Name |
Default Value |
Units |
---|---|---|---|---|
Capital cost A parameter \(^1\) |
\(A\) |
|
1246.1 |
\(\text{USD}_{1990}\) |
Capital cost B parameter \(^1\) |
\(B\) |
|
0.71 |
\(\text{dimensionless}\) |
Costing Method Variables
There are no costing method variables unique to the CSTR.
Capital Cost Calculations
Capital cost is dependent upon the unit’s volume, \(V\), as shown in the equation below.
\[C_{cap,tot} = A * V^{B}\]
Operating Cost Calculations
There are no operating costs unique to the CSTR.
Code Documentation
References
[1] Eberle, Annika, Irina Tsiryapkina, Steve Peterson, Laura Vimmerstedt, Dylan Hettinger, and Daniel Inman. 2020. An Overview of the Waste-to-Energy System Simulation (WESyS) Model. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-77166. https://www.nrel.gov/docs/fy21osti/77166.pdf.